It began to snow Sunday late afternoon, the temperature has really dropped, Monday snowed in, too risky to try drive anywhere. So pilled as much wood as possible into the stove.
The canal is now frozen over, I can almost walk across. Anyhow the towpath is very quite, very few people walking of cycling since Sunday. I've just checked the thermometer, it's now -12°c outside. The forecast said it will slowly warm up... Can't wait.
Tuesday, January 25, 2005
Wednesday, January 19, 2005
Closed for Winter
Generally the canal has closed in mid November and reopens at the end of March. Here are the main reasons.
Generally there is enough water tleft to keep the fish alive, however the fishing guards will come along to rescure the larger fish, netting them and then transporting them to the pound below.
The canal workers can now remove the pieces of oak used as seals, replacing them with new oak which is finished on site to have an exact fit. They will also repair or maintain the sluice gates when required.
When finished, the lock doors are closed and the canal pound is refilled with water from the lock above. The whole job can be done in 48 hours.
- The water supply becomes low. During the Summer the barge traffic consume the water supply which is stocked in the main reservoirs. This water supply is accumulated during the winter period.
- There is much less boat traffic during the winter, maintaining all the lock keeprs at their posts is not very resonable.
- The locks and canal require maintenace, which often requires streches of water between locks to be emptied. Therefore navigation is closed.
Generally there is enough water tleft to keep the fish alive, however the fishing guards will come along to rescure the larger fish, netting them and then transporting them to the pound below.
The canal workers can now remove the pieces of oak used as seals, replacing them with new oak which is finished on site to have an exact fit. They will also repair or maintain the sluice gates when required.
When finished, the lock doors are closed and the canal pound is refilled with water from the lock above. The whole job can be done in 48 hours.
Subscribe to:
Posts (Atom)